Renovations 2015

COOL CHANGE (Dec 2015) 

  • Pontoon maintenance
  • New side and ceiling cladding
  • Back top and bottom deck extension
cool-change-before

Before Renovation

DSC_0071 (800x535)

During Renovation

New Extended Back Deck

New Extended Back Deck

cool-change-after-2

Sitting on the water at sunset

FUGITIVE

  • Pontoon and Duckboard Maintenance
  • Recladding and Painting of Exterior
  • Grey Water Installation
Fugitive4

After Renovation

Fugitive 3

During Renovation

DSC_0039

Before Renovation

 

 

 

 

 

UNITS 

  • Pontoon and Duckboard Maintenance
  • Recladding and Painting of Exterior
  • Grey Water Installation
Units Pic

After Renovation

IMG_7772

During Renovation

600 P4200017

Before Renovation

 

 

 

 

 

OUTBOUND –

  • Pontoon & Duckboard maintenance
  • Full exterior paint refurbish. Replacing the grey with white.

After Renovation

Start of Renovation

 

 

 

 

 

 

BLINDA –

  • Pontoon and Duckboard Maintenance
  • Full exterior paint refurbish. Replacing the grey with white.
After Renovation

After Renovation

Before Renovation

 

 

 

 

 

 

SANTE –

  • Replace the cladding with white smooth finish Alucobond
  • Pontoon & Duckboard maintenance
  • 12V Electric fridge put in
  • Full repaint of all fibreglass surfaces
After Renovation

After Renovation

Before Renovation

Before Renovation

 

 

 

 

 

 

RHAPSODY –

  • Replaced the cladding with white smooth finish Alucobond
  • Pontoon and Duckboard Maintenance
  • Additional ski deck and extended duckboard to incorporate ski decks
DSC_0616

Rhapsody

Before Renovation

Before Renovation

 

 

 

 

 

 

LIQUID GOLD –

  • Replacement of ceiling and eve linings
  • Pontoon refurbishment and repainted
  • Back deck repainted

After Renovation

Liquid Gold Pic 1

Before Renovation